सुप्रबन्धे राष्ट्र समृद्धि

Overall

Status

Projects (Nos)

Proposed Cost (in Cr.)

Appraised Cost (in Cr.)

731

73

101

20

66560.06

5433.77

6313.17

1323.43

61762.34

--

--

--

Total saving after appraisal (Cr.)

Rs.4797.72

EFC (EPC)

Status

Projects (Nos)

Proposed Cost (Cr)

Appraised Cost (Cr)

33

4

6

3

15538.18

985.13

1498.00

626.61

14749.99

--

--

--

EFC (NON EPC)

Status

Projects (Nos)

Proposed Cost (Cr)

Appraised Cost (Cr)

475

61

43

16

44795.91

4337.27

4098.30

691.22

42256.71

--

--

--

NON EFC

Status

Projects (Nos)

Proposed Cost (Cr)

Appraised Cost (Cr)

217

8

51

1

4596.35

111.37

597.27

5.60

3234.65

--

--

--

PIB

Status

Projects (Nos)

Proposed Cost (Cr)

Appraised Cost (Cr)

5

0

1

0

1620.42

0.00

119.60

1513.14

--

--

--