सुप्रबन्धे राष्ट्र समृद्धि

Overall

Status

Projects (Nos)

Proposed Cost (in Cr.)

Appraised Cost (in Cr.)

1310

13

113

22

117753.16

3835.56

8638.28

2065.94

110079.64

--

--

--

Total saving after appraisal (Cr.)

Rs.7673.52

EFC (EPC)

Status

Projects (Nos)

Proposed Cost (Cr)

Appraised Cost (Cr)

60

1

5

4

41700.61

309.04

1330.33

870.78

39322.42

--

--

--

EFC (NON EPC)

Status

Projects (Nos)

Proposed Cost (Cr)

Appraised Cost (Cr)

726

8

45

18

64851.20

3372.52

6111.48

1195.16

61341.16

--

--

--

NON EFC

Status

Projects (Nos)

Proposed Cost (Cr)

Appraised Cost (Cr)

519

3

61

0

9580.94

40.29

801.21

0.00

7902.92

--

--

--

PIB

Status

Projects (Nos)

Proposed Cost (Cr)

Appraised Cost (Cr)

5

1

2

0

1620.42

113.70

395.26

1513.14

--

--

--