सुप्रबन्धे राष्ट्र समृद्धि

Overall

Status

Projects (Nos)

Proposed Cost (in Cr.)

Appraised Cost (in Cr.)

813

54

131

29

48454.32

11170.09

8135.62

1717.62

45965.67

--

--

--

Total saving after appraisal (Cr.)

Rs.2488.65

EFC (EPC)

Status

Projects (Nos)

Proposed Cost (Cr)

Appraised Cost (Cr)

36

2

7

4

14022.34

8031.91

1693.07

490.76

13462.46

--

--

--

EFC (NON EPC)

Status

Projects (Nos)

Proposed Cost (Cr)

Appraised Cost (Cr)

339

41

59

14

28149.17

2937.66

5756.03

885.55

26474.16

--

--

--

NON EFC

Status

Projects (Nos)

Proposed Cost (Cr)

Appraised Cost (Cr)

434

11

65

9

5715.56

200.51

686.52

168.51

5477.75

--

--

--

PIB

Status

Projects (Nos)

Proposed Cost (Cr)

Appraised Cost (Cr)

3

0

0

2

542.85

0.00

0.00

527.83

--

--

--